Architectural Contract Services Ltd

glass reinforcement plastic england Soffit designs fibre glass england Grp England

CompanyArchitectural Contract Services Ltd

ContactMr B Stearn
AddressStable Cottage Industries
Wheatsheaf Road
Henfield
West Sussex
England UK
BN5 9AU (MAP)
Telephone01273 495188
Fax01273 495199
Email
The Product – by ACS Building Systems Ltd is a closed timber frame panel system with a factory produced external weatherproof finish.

This is the building system which the construction industry has been waiting for. The product has a built in flexibility that allows for both pre designed or bespoke homes to be quickly constructed in a controlled factory environment and delivered to site ready for fast assembly. The product complies with current building regulations to obtain local authority building and planning consent.

These include:
  • High energy efficiency (SAPS formula compliant)
  • High insulation properties, ‘U’ value in excess of current building regulation requirements
  • Acoustically sound
  • Fire resistance
  • Impact resistance
  • Very low maintenance
  • Non absorption properties
  • Mould resistance
  • Corrosion resistance
  • Durable >60 years

This system is the fastest and most cost-effective technique currently available for creating homes.

The reason for this is that the sections are structurally sound, insulated and weatherproof using a unique closed timber frame panel system with high quality materials and quality control methods to ensure that each panel leaves the factory ready for instant site use.

Unlike all other SIPs (Structural Insulated Panels) this product does not require an outer finish to be applied at site. The system totally removes the need for lengthy and costly outer brick or render finishes to be applied. These construction methods usually account for a large percentage of traditional build budgets and can take up to 50% of the time frame allowed for each building project (weather permitting).

The system can have an outer finish chosen by the customer to include for the following effects : brick, render, pebbledash and timber. It will be pre applied at the manufacturing stage. In fact, most external finishes can be replicated. If required windows, doors and external venting systems can all be pre fitted at the factory to save time on site assembly.

CLOSED TIMBER FRAME PANEL SYSTEM


A external finish 6mm
B MDF 12 mm acoustic membrane
C Backing 2 mm
D Foamglas insulation to specified ‘U’ value required under local building regulations
E OSB 19 mm anti racking panel
F Tanalised Timber Frame 100 x 50 mm to BS standard 5268-1 & 5268-6.1

Example of external finishes


Search the Construction Industry on Build


Project Management, Tyrone

CGIs Ltd
  • Wind Farms
  • Cable Jointing
  • Offshore Rewnewable Energy
  • Cable Installation
  • HV and LV Cable Jointers
  • Gas and Oil Offshore
www.cgisltd.com


There are no companies listed in Project Management , Tyrone at this time.



All UK Regions
East Midlands109
Eastern England102
Ireland37
London 126
Merseyside 101
North East England103
North West England112
Northern Ireland 31
Other1
Scotland36
South East England134
South West England113
Wales 94
West Midlands 102
Yorkshire & The Humber 102

View SelfBuilder

Tunnel Segment Plant Begins Full Operations
£4m Boost For Regeneration Plans In Wales
Construction Champions Announced
Apollo Scoops £4m Contracts
Sweett Group Appointed On Flagship Hotel In London
Lovell Respond Joins Forces With Notting Hill Housing
Gas Fitter Prosecuted For Illegal Work
Progress Of Bill To Outlaw Phoenix Firms Welcomed
The Academy Of Joint Integrity Invest In FADU
DECC Unveils Details Of Energy Efficiency Deployment Office
Plans Unveiled For Coventry City Centre South Redevelopment
Ringway Scoops £250m Contract
Largest Norwegian Timber Housing Scheme Built In Redditch
Workers Seriously Injured after Fall
Kier Offers Second Degree Programme
Knowsley Council And E.ON Form Low Carbon Partnership
British Gas Reassures Customers Following Rise In Prices
Special Offer For Composite Doors Croydon
Irish Construction : (www.build.ie) | Scots Construction (www.buildscotland.co.uk) | UK Construction (www.build.co.uk)
Site Map | SelfBuild | Webmaster Resources | Login to Edit Directory Entry
UK Construction Jobs | Scots Construction Jobs | Irish Construction Jobs | UK Construction News Archive | Irish Construction News Archive
UK Construction News RSS Feed | Scottish Construction News RSS Feed | Irish Construction News RSS Feed | Irish National News RSS Feed
Flagship Media Group Ltd
Unit C3, 6 Westbank Drive, Belfast,
BT3 9LA, Northern Ireland
Tel (+44) 28 9031 9008
Contact : Click here

keycons003 / keycons003xLIS / keycons003x6 10/02/2012 06:45:10 / A4 / B1 / 0.390625, 38.107.179.2330

glass reinforcement plastic england,Soffit designs fibre glass england,Grp England

glass reinforcement plastic england,Soffit designs fibre glass england,Grp England