|
|
|
              
|
|
 | |  | | | BubbleDeck UK (2008) Ltdstructural flooring system england bubbledeck | | | Company | BubbleDeck UK (2008) Ltd | | | Contact | Paul Harding | | Address | White Lodge Wellington Road Jersey Channel Islands United Kingdom JE2 7TE (MAP)
| | Telephone | 01534 725402 | | | Fax | 01534 739115 | | Email | | | Website | www.bubbledeck-uk.com | | | BubbleDeck® is a revolutionary structural flooring system, which has proved to be highly successful throughout Europe over the last fourteen years. BubbleDeck® comprises a voided biaxial flat concrete slab spanning in two directions, into which plastic balls are incorporated to eliminate the concrete in the middle of a conventional slab that does not contribute to structural performance. Significant reduction of up to 33% in the slabs dead weight enables dramatically longer spans and cantilevers, not feasible with other structural solutions. The BubbleDeck® system is self-supporting without requiring any primary structure such as beams for its structural performance. Providing inbuilt fire protection, acoustic airborne insulation, with a finished surface ready for decorating, BubbleDeck® means many subsequent trades and consequent cost is avoided.
BubbleDeck® is available across the United Kingdom and Channel Islands exclusively through Bubbledeck UK and has been successfully used on several completed major UK projects.
The advantages of BubbleDeck® are many:
- It allows freedom of design with non-rectilinear plan forms
- As no beam support is required, it allows longer spans between supports
- It enables reduced foundation sizes since the structural dead-weight is reduced by 50%
- Downstand beams are also unnecessary or can be incorporated in slab depth where required
- Cross-bracing and intermediate supports are eliminated
- Concrete usage is significantly reduced; 1kg of recycled plastic replaces 100kg of concrete. It is, therefore, environmentally friendly.
- It uses fewer building elements compared to steel frame and metal decking systems and so reduces erection time
- Since the blockwork is non load-bearing it is taken off the critical path
- Soffits can be left exposed, facilitating low/passive energy design methods
- Conduits and cooled slab systems can be incorporated into the slabs in the factory
The overall result is a significant cost saving of between 2.5% to 10% of total construction costs.
|
|
| | |  | | |
|
 | |  | | | |
|
There are no companies listed in Concrete Floor Slabs , Tyrone at this time.
|
| | |  | | |
|
|
|
|
              
|
|
| Flagship Media Group LtdUnit C3, 6 Westbank Drive, Belfast, BT3 9LA, Northern Ireland Tel (+44) 28 9031 9008 Contact : Click here |
keycons003 / keycons003xLIS / keycons003x6 10/02/2012 10:32:34 / A8 / B5 / 0.296875, 38.107.179.2330
floor span,pitch span,span building,span construction,span tables,structural bracing,structural building,structural buildings,structural calculation,structural calculations,structural ceiling,structur
Lighter Flat Slab Technology,building flooring,concrete flooring,design flooring,flooring cement,install flooring,precast flooring,
|